Theory · topic 9 of 10 · 10 min

Ropework, towing, anchoring & docking

Bigger yacht, worse weather, a number or a decision wanted. Rope stretches or it does not, an anchor holds only along the seabed, and every load needs somewhere strong to go.

1 · Rope

Stretch, strength, and what a knot costs

How much strength does a bowline take out of a rope?

A bowline leaves about 60 % of the rope's strength, a splice about 90 %, a tight turn over a thin pin less. Divide what is left by a safety factor for the safe working load.

RopeBehaviour and use
NylonStretches: snubbers, tow and dock lines. Stiff and faded is weak
Dyneema1% stretch, slippery, melts near 150 °C: no snubber
AramidFlexing and UV weaken it unseen: replace on age

A splice keeps about 90%, a bowline 60%, a tight turn over a thin pin less; divide what is left by a safety factor for the safe working load.

Working load of a tow line
  • 16 mm nylon: breaks at 6.0 t when new
  • Wet: × 0.85 = 5.1 t
  • A bowline in it: × 0.6 = 3.06 t
  • Safety factor 5: about 0.6 t
  • Nylon: five tucks in an eye splice; a long splice keeps the diameter. Dyneema: knots slip, bury a long tapered tail.
  • Heavy warps: a seized carrick bend still unties; a bowline shakes loose in a surge. Sew whippings; coil right-hand lay clockwise; end-for-end a worn halyard.
Doubled lines in a surge
  • Line A 6 m, line B 12 m, both just taut
  • Stiffness ∝ 1 ÷ length: A is twice as stiff
  • A takes two-thirds of every snatch
  • Make doubled lines the same length
2 · Ground tackle

The anchor for the seabed

Which type of anchor holds in sand, soft mud or kelp?

Match it to the seabed: a roll-bar anchor in sand, as it resets when she swings; wide Danforth-type flukes in soft mud; a fisherman through kelp over rock. Nothing holds in sea-grass: find pale sand.

SeabedWhat holds
SandRoll-bar anchor: resets as she swings
Soft mudWide flukes, Danforth type
Kelp over rockFisherman: narrow fluke gets through
ShingleHeavy, sharp, loaded gently
Sea-grassNothing: find pale sand
BouldersBuoy the chain's middle

The gypsy fits one chain standard; another jumps off under load. Lengthen the rode with 8-plait nylon spliced into the last link. Size chain for the whole load, worn: a snubber spares the windlass, not the chain.

Lower under power in deep water: free-falling chain outruns the brake. The windlass lifts only what hangs off the bottom. Lash the bitter end where you can cut it.

3 · At anchor

Enough rode, enough room, and a watch

How much anchor chain should I let out for a gale?

Measure scope from the bow roller: depth plus the roller's height, times 7 for a gale on chain and rope. In 18 m with the roller 2 m up, that is 140 m.

Scope is measured from the bow roller: depth plus its height, times the ratio, 7:1 for a gale on chain and rope. Heavier chain needs less.

Room to swing
  • Radius = chain along the bottom + boat
  • 60 m of chain, roller 12 m above the seabed
  • √(60² − 12²) ≈ 59 m; + 24 m of yacht = 83 m
  • Boats lying differently: add both radii

Log a radar range and bearing every 15 minutes and set the alarm. An arc on the plotter is swinging, a straight line downwind dragging. Leave an open roadstead before an onshore gale; a strange bay at night: radar, sounder, a charted contour.

Against sheering: a riding sail aft on a ketch, a second anchor under foot on a high-bowed motor yacht. The kedge goes out in the tender, warp paid out as you go; aground on a lee bank, lay it to windward now.

4 · Two anchors

A V for a gale, a line for a stream

How do I lay a Bahamian moor in a reversing tidal stream?

Let go up-stream, drop back twice the scope, let go the second anchor, then heave back to the middle: a Bahamian moor lies in line with the stream, the yacht between its two anchors.

For a gale that will veer, lay both anchors ahead in a V across the shift, so each takes its share.

In a reversing stream lay a Bahamian moor: two anchors in line with it, the yacht between. Let go up-stream, drop back twice the scope, let go again, heave back to the middle. A cross wind pushes her sideways until both legs are taut.

5 · Berthing

Springs, screws and the stream

How do I walk a twin-engine yacht sideways?

With twin screws, one ahead and one astern, the stern swings towards the engine going ahead; put the bow thruster the same way and she walks sideways.

Twin screws: one ahead, one astern, the stern swings towards the engine going ahead; thruster the same way and she walks sideways. One engine astern alone throws the stern away from it: outward-turning, offset and prop walk add up. A right-handed propeller kicks the stern to port astern: get sternway on early.

BerthWhat works
Stream along quayBoth engines ahead, bow angled in: it ferries her over
Stream asternPass the berth, back up against it
PilesUp-tide pile first; fender board in a swell
Tidal wallSlack in long springs: 15 m needs 0.8 m for 5 m
RaftLargest inside; outer boats cast off to let you out
Stern-to in a gusty crosswind
  • Gusts 26 kn: load ≈ V² ÷ 60 kgf per m²
  • Bow windage 24 m²: 26² ÷ 60 × 24 ≈ 270 kgf
  • Thruster 160 kgf cannot hold it
  • Anchor upwind, snub the chain: it holds the bow
  • Engines place the stern

Plan for the gust; the thruster is for short bursts. Crossed stern lines check a sideways swing; where lazy lines lie, your anchor fouls the ground chains.

6 · Towing

A long, elastic line and a slow tow

How long should the towline be when towing another yacht in a seaway?

About one wave length, 1.56 × the period squared: with an 8-second sea, 100 m. The spring is nylon's stretch, not a weight on the line; tow at about two-thirds of hull speed.

DecideRule of thumb
TowlineOne wave length, 1.56 × T²: 8 s, 100 m
Speed⅔ of hull speed 1.34 × √LWL ft: LWL 10 m, 5.1 kn
Bridle legPull ÷ 2 cos half-angle: 1.6 t at 90°, 1.1 t

Agree channel, speed and signals first. Make fast with turns round a strong point you can ease or cut; a ship's tow: spread the pull over mast foot and both bow cleats. Chafe parts tows; the spring is nylon's stretch, not a weight on the line.

Night orders for the tow
  • Watch aft on the line, knife to hand
  • Chafe and VHF check every hour
  • Tow steers in our wake; drogue if she sheers
  • Line parts: engines neutral, recover it
  • Before the bar: shorten up, then alongside
  • Offshore: tender on deck

Length of tow: your stern to the tow's stern. Over 200 m: three masthead lights, not two, and diamonds by day. No towing lights? Light the towline (Rule 24(i)).

Up to 200 m
Over 200 m
From astern
7 · Heavy weather

An end to the seas

In a gale, should I heave to, run off or use a sea anchor?

Never lie a-hull, beam-on to breaking crests. Heave to with the main eased and helm to leeward to drift slowly, run off fast with a drogue on a bridle, or lie to a parachute sea anchor for the least drift.

Never lie a-hull: beam-on, a breaking crest can roll her. Drift times hours of gale must fit your sea room.

TacticHow
Heave toMain eased, helm to leeward, 50° off the wind; slow
Run offDrogue on a bridle to both quarters, 1.5 wave lengths; fast
Sea anchorParachute from the bow on long nylon; least drift; trip line

The trysail has its own track and two sheets to the quarters, led before hoisting; a forward lead tightens the leech. The storm jib hanks to an inner forestay on a tack pennant; try both in harbour.

Can she run with the seas?
  • LWL 21.5 m = 70.5 ft: 1.34 × √70.5 ≈ 11 kn
  • Period 6 s: 1.56 × 6 = 9.4 m/s ≈ 18 kn
  • She cannot keep up: slow down,
    let them pass under her

A motor yacht cannot heave to: she jogs at displacement speed, seas fine on the bow, and running lets faster waves pass, tabs up. A lowered trim tab lifts its own side; a burst ahead on the engine she yaws towards checks her.

Practice questions

Questions from this topic, as the app asks them. Open one to see the answer.

The mate's offer for the snubber
  • 14 mm Dyneema, spare halyard stock
    “Twice as strong as our nylon”
  • Stretch at working load: about 1%

You are rigging a snubber for a night at anchor in your 24 m yacht, with a swell running in. Your mate offers the line in the figure. What do you say?

  1. No: it hardly stretches, so each snatch hits the fittings
  2. Yes, if you double it so that it can never part
  3. Yes, once each end has a good whipping on it
  4. Yes: twice the strength means half the risk of parting
Show the answer

A. No: it hardly stretches, so each snatch hits the fittings

A snubber works by stretching; Dyneema stretches about 1%, so the shock loads go straight into the chain, cleats and windlass.

Rope — materials · Explained in: Rope

Lengthening the rode
  • Windlass gypsy takes rope and 10 mm chain
  • 50 m of chain now; adding 100 m of rope
  • The join must run over the gypsy

You are lengthening the rode of your 20 m yacht for a season of deep anchorages. Which rope and which join?

  1. Dyneema braid, with a thimbled eye and a shackle
  2. Three-strand polyester, shackled to the last link
  3. 8-plait nylon, with a thimbled eye and a shackle
  4. 8-plait nylon, spliced through the last chain link
Show the answer

D. 8-plait nylon, spliced through the last chain link

8-plait nylon stretches and stows without kinking; a rope-to-chain splice runs over the gypsy, where a shackle and thimble jam.

Anchoring — chain and rope rode · Explained in: Ground tackle

You must ride out a gale at anchor here, with no tide to allow for. How much nylon do you let out after the chain?

  1. About 140 m
  2. About 60 m
  3. About 20 m
  4. About 46 m
Show the answer

B. About 60 m

(18 + 2) × 7 = 140 m of rode; less the 80 m of chain = 60 m of nylon.

Anchoring — scope by depth and weather · Explained in: At anchor

You must ride out this gale at anchor in the lee of the shore, with good sand and plenty of room. How do you lay two anchors?

  1. One to the SE and one to the SW, 90° apart
  2. One to the SW and one to the NE, 180° apart
  3. Both let go together, close under the bow
  4. Both ahead in a V: one to the SW, one to the W
Show the answer

D. Both ahead in a V: one to the SW, one to the W

An open moor spreads two anchors ahead across the expected wind, so both share the load as it veers; 180° apart is for a reversing stream.

Anchoring — two anchors · Explained in: Two anchors

Your 22 m motor yacht lies parallel to the pontoon, 4 m off it to starboard. How do you walk her sideways onto it?

  1. Thruster to starboard; starboard engine ahead, port astern
  2. Thruster to port; starboard engine ahead, port astern
  3. Thruster to starboard; both engines slow ahead
  4. Thruster to starboard; port engine ahead, starboard astern
Show the answer

A. Thruster to starboard; starboard engine ahead, port astern

Starboard ahead and port astern swing the stern to starboard; the thruster pushes the bow the same way, so she moves bodily sideways.

Twin-screw handling · Explained in: Berthing

Tow 80 M offshore, a long swell
  • Swell period 8 s, from astern
  • Deep-water wave length ≈ 1.56 × T² m
  • Towline aboard: 150 m of 24 mm nylon

You are towing a dismasted yacht home. How much towline do you let out?

  1. About 12 m
  2. About 50 m
  3. About 100 m
  4. About 150 m
Show the answer

C. About 100 m

1.56 × 8² ≈ 100 m: one wave length keeps both boats on the same part of a wave; at 50 or 150 m one is on a crest, one in a trough.

Towing — length of towline · Explained in: Towing

Practise it

All 100 questions of this topic are in the app: practice by topic with the reason after every answer, your mistakes brought back, and a timed mock exam. Free, no sign-up, in the browser or in Telegram.